Customization: | Available |
---|---|
Additional Capabilities: | Coating, Granulating |
After-sales Service: | Engineers Available to Service Machinery Overseas |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Anode graphite is the biggest part of lithium-ion batteries by weight, but only a small percentage of the cost. Our these coating equipment can be used for making artificial graphite anode material of lithium battery, they mainly include the material measuring tank, heating reactor, cooling reactor, heating furnace, condensation holding tank for end-gas and PLC control system. They are developed by our professional engineers and impoved by our years experience, they can improved the working efficiency, granulation effect and mixing effect, and have been proved they are an excellent coating equipment and widely used in anode graphite industry.
Below are the advantages of our these machines.
1. The material product yield is high, the yield coefficient by our machines usually can up to 95%, but other machines usually is about 80%.
2. The cooling time of material is short, reduce the temperature from high level to 50 °C only needs 2.5-3 hours, it saves the energy cost a lot.
3. The automatic level is high, basically realize BUTTON START mode, it saves the labour cost a lot.
4. The waste of material is less, the distance between mixing shafts and wall is about 10mm.
Volume (L) | Total Power (KW) | Heating Power (KW) | Motor Power of Granulator (KW) | Motor Power of Cooler (KW) | Mixing Speed (R/MIN) | Handling Capacity / Batch KG | Capacity (Day/Times) | Material Cooling Time (H) | Nitrogen (M³/H) | Exhaust Smoke Volume (M³/H) | Cooling Cycle (M³/H) | Yield (%) | Pitch Ratio (%) |
100L | 43 | 30 | 4 | 3 | about 0-80 | about 12-16 | about 2.5-4 | from 600°C to 50°C about 4h | about 0.2-4 | about 70 | 12 | about 90-95 | about 3-9 |
2000L | 175 | 130 | 30 | 15 | about 0-80 | about 300-400 | about 2.5-4 | from 600°C to 50°C about 4h | about 0.2-4 | about 500 | 35 | about 90-95 | about 3-9 |
4000L | 267 | 190 | 55 | 22 | about 0-80 | about 650-800 | about 2.5-4 | from 600°C to 50°C about 4h | about 0.2-4 | about 700 | 50 | about 90-95 | about 3-9 |
7000L | 385 | 280 | 75 | 30 | about 0-80 | about 1150-1400 | about 2.5-4 | from 600°C to 50°C about 4h | about 0.2-4 | about 900 | 60 | about 90-95 | about 3-9 |
10KL | 485 | 350 | 90 | 45 | about 0-80 | about 1550-1800 | about 2.5-4 | from 600°C to 50°C about 4h | about 0.2-4 | about 1200 | 75 | about 90-95 | about 3-9 |
By TT, 40% deposit is paid before production, 60% balance is paid before delivery.
It depends on the quantity of order, usually between 2-3months.
We can send engineers overseas to assistant with customer for the installation of these machines and training for their workers if necessary.
THANK YOU FOR YOUR READING !
WE LOOK FORWARD TO COOPERATING WITH YOU IN THE NEAR FUTURE !